Logo Proes

Construction project for bridges and viaducts on the Rio Magdalena 2 highway, Colombia-2.

11 

puentes o viaductos proyectados

144 

kilómetros de via

The purpose of this highway is to provide a direct connection between the southern and central regions of Colombia with the port of Cartagena and the northern part of the country, as well as the northeast of Antioquia with the Ruta del Sol concession through Puerto Berrío, becoming one of the most significant infrastructure projects in the country.

The project involves improving the existing roadway, rehabilitating the remainder of the Alto de Dolores-Puerto Berrío stretch, and constructing a new single-carriageway road between Remedios and Alto de Dolores. Within the project, there are plans for 11 bridges or viaducts, as well as upper and lower vehicular passes.

 

Location Magdalena, Colombia

Date: 2017

Alcance del proyecto: constructive project

Significant data: The roads under the Autopista al Río Magdalena 2 concession have an estimated total length of 144 kilometers.

Other projects

27.046.000 € PEM 17,7 km length The Anillo Verde Ciclista de Madrid is a circuit whose objective is to connect several parks and green areas of

1.586.000 € PEM The work consists of doubling the access bridge to the industrial estate, separating incoming and outgoing traffic from the road.

295 m length The section of the Monforte del Cid-Aspe High Speed Line, in the province of Alicante, with a total length of 7,840 km.