Basic engineering design of the pier structure for the Caleta Viuda desalination plant, Chile

296 m

Pier 

The project involves the development of basic engineering for the structure of the auxiliary dock for the Caleta Viuda seawater desalination plant. This includes a 296-meter-long jetty, consisting of gantries with a 6-meter span, spaced at 8 meters apart except for the last four, which have an 8-meter span.

Additionally, a dilution study is conducted, which involves designing the system to be installed in the brine discharge outfall from the desalination plant to minimize the environmental impact in the discharge area.

Location Commune of Tocopilla, Antofagasta, Chile

Date: 2014

Scope of the project: Basic Engineering for the Dock Structure and Dilution Study

Other projects

669,532.00 US$ PEM 5 MTPA LNG Plant Capacity Over the past 16 years, the Government of Timor Leste has carried out engineering studies for the

21 km² surface area < 30.000 t ship capacity The port facility of Las Salinas de Torrevieja is located in the port of Torrevieja,

The port of Gijón, immersed in a project to extend its port facilities and reorganise its quays, is proposing to Repsol Butano the relocation of its quays.