Expansion of the port of Estepona, Malaga

45,8 M€

Budget 

24 new ha.

surface

The expansion of the port of Estepona involves the action on 24 new hectares of surface, of which 6 correspond to sheltered water sheet, which will allow the mooring of 456 new pleasure boats between 10 and 30 m in length.

The project consisted of the development, at the basic project level, of the works comprising the expansion of the port with 1,140 m of breakwaters, 1,100 m of docks and 1,400 m of floating pontoons. Other works carried out are the technical and economic justification of the action, the environmental impact study, as well as the urban and territorial planning.

 

Location port of Estepona, Málaga

Date: 2008-2011

Budget: 45.781.564,43 €

Scope of the project: study of alternatives and basic project for the works comprising the expansion of the port's current facilities. Preparation of the Environmental Impact Study

Other projects

669,532.00 US$ PEM 5 MTPA LNG Plant Capacity Over the past 16 years, the Government of Timor Leste has carried out engineering studies for the

145.730 € Budget 10,777 m length Proes participates in the execution and supervision of all the activities that were carried out in the installation.

11.53 M€ Budget 17 m reinforced concrete caisson props On the occasion of the America's Cup, and the use of the inner harbour basin, the following works have been carried out