Dique de abrigo de la bocana de entrada al puerto de Ibiza, Baleares

3,78 M€

Budget 

109,5 m

height of vertical breakwater

The purpose of the construction project is to define the necessary actions for the design and construction of the breakwater of the dock of the marina of Ibiza Nueva.

The proposed solution consists of the construction of a vertical dike of 109.50 m in length consisting of reinforced concrete caissons connected to the ground through a section of prefabricated concrete blocks. In addition, and given the conditions of the terrain, it is necessary to carry out a treatment of the terrain in the foundation of the dike, consisting of the execution of gravel columns.

 

Location port of Ibiza, Balearic Islands

Date: 2010-2012

Budget: 3.783.951,44 €

Scope of the project: constructive project

Significant data: reinforced concrete caisson breakwater

Other projects

669,532.00 US$ PEM 5 MTPA LNG Plant Capacity Over the past 16 years, the Government of Timor Leste has carried out engineering studies for the

145.730 € Budget 10,777 m length Proes participates in the execution and supervision of all the activities that were carried out in the installation.

45.8 M€ Budget 24 new hectares of surface area The extension of the port of Estepona involves work on 24 new hectares of surface area, of which