Structural verification report of the mobile crane pier in Topolobampo, Mexico

140 m

lenght of the pìer

It involves the preparation of a technical report to verify the structural capacity of the existing container berths at Bajo de Gallinas, Topolobampo terminal, with regard to the possibility of using a Gottwald HMK-300E mobile crane.

The terminal structure consists of four piloted modules measuring 21.60 m in plan, forming a 140 m long pier.

Location Topolobampo terminal, Mexico.

Date: 2006

Significant data: crane weight 416 t unladen and 460 t in operation