Detailed engineering for new office building at WLC 350, Airbus

40

Work stations

New office room in the paint booth area of the production plant of the A350 WLC. It houses 40 workstations and a meeting room.

Fire protection: detection, extinguishing and system. HVAC. LV electrical design, including UPS. Voice transmission and datos.speaker. Control system.

Location Spain

Date: 2016-2017

Scope of the project: detailed engineering

Other projects

Power supply: HV/MV substation: 69/13.2 kV 14 MVA 3 MV/LV substations: 13.2 kV/480 V (400 kVA, 1,000 kVA and 3×2500 kVA) Complete MV design and

8 m Luminaire pole height Roundabout lighting design based on luminaires on 8 m high poles, lamps of

9 Piperack aerial hydrocarbon pipes: 9 hydrocarbon pipes: 5 x 14″, 4 x 18’ and pipes for other installations: 2 x 2″ of