Detailed engineering and construction management of Ariane 6 factory, Airbus

13.500 kVA

Power installed

Project Management and Detailing of Industrial Area, clean room (ISO-8) and building of offices according to BIM methodology.

Electrical (MV, LV and all the design, an installed capacity of 13,500 kVA), water supply, drainage, irrigation, fire protection, speakers, HVAC (12 UTAs), compressed air, vacuum, gas, communications, I&C, control system, security and CCTV.

 

Location Getafe, Spain

Date: 2017-2020

Scope of the project: detailed engineering

Other projects

Power supply: HV/MV substation: 69/13.2 kV 14 MVA 3 MV/LV substations: 13.2 kV/480 V (400 kVA, 1,000 kVA and 3×2500 kVA) Complete MV design and

8 m Luminaire pole height Roundabout lighting design based on luminaires on 8 m high poles, lamps of

9 Piperack aerial hydrocarbon pipes: 9 hydrocarbon pipes: 5 x 14″, 4 x 18’ and pipes for other installations: 2 x 2″ of