
13.500 kVA
Power installed
Project Management and Detailing of Industrial Area, clean room (ISO-8) and building of offices according to BIM methodology.
Electrical (MV, LV and all the design, an installed capacity of 13,500 kVA), water supply, drainage, irrigation, fire protection, speakers, HVAC (12 UTAs), compressed air, vacuum, gas, communications, I&C, control system, security and CCTV.
Location Getafe, Spain
Date: 2017-2020
Scope of the project: detailed engineering