Logo Proes

Engineering for a new LNG pipeline rack in Indonesia

15,4 km

Lenght

Offshore LNG pipeline rack between land and FSRU structure.

  • 20" LNG pipeline
  • Lenght: 15,4 kilometres 

Onshore LNG pipeline rack between the ground and the takeoff station:

  • 20" LNG pipeline
  • Lenght: 5,0 kilometres

 

Location Indonesia

Date: 2010-2013

Scope of the project: detailed engineering

Other projects

Power supply: HV/MV substation: 69/13.2 kV 14 MVA 3 MV/LV substations: 13.2 kV/480 V (400 kVA, 1,000 kVA and 3×2500 kVA) Complete MV design and

8 m Luminaire pole height Roundabout lighting design based on luminaires on 8 m high poles, lamps of

9 Piperack aerial hydrocarbon pipes: 9 hydrocarbon pipes: 5 x 14″, 4 x 18’ and pipes for other installations: 2 x 2″ of