Algeria/Oman Fertilizer Project Terminal Project (2007-2013), Arzew-Bethioua, Algeria

1.200 m

Lenght of the access bridge

260 m

Lenght of the platform

Mers El Hadjdaj is an offshore terminal for the loading of urea and ammonia. The facility consists of a 1,200 m long and 17 m wide access bridge connecting the shore with a 260 m long by 62 m wide platform.

The jetty is complemented by three mooring duchesses that allow the simultaneous berthing of two vessels of up to 245 m in length and 32 m in breadth.

Location Arzew-Bethioua Bay. Oran, Algeria

Date: 2007

Scope of the project: Study of alternatives for the optimal location of the Urea/Ammonium terminal.

Other projects

669,532.00 US$ PEM 5 MTPA LNG Plant Capacity Over the past 16 years, the Government of Timor Leste has carried out engineering studies for the

145.730 € Budget 10,777 m length Proes participates in the execution and supervision of all the activities that were carried out in the installation.

45.8 M€ Budget 24 new hectares of surface area The extension of the port of Estepona involves work on 24 new hectares of surface area, of which