LNG terminal project at Port Qasim, Karachi, Pakistan

188 M$

of budget

500 million m³

of daily supply

The basic project consists of drafting the FEED documentation for the LNG terminal at Qasim Port, Karachi, including the review of the berth configuration and design of the platform structures, the terminal's mooring dukes, as well as the piping and pipeline.

 

Location: port of Karachi, Sind Region, Pakistan

Date: 2012

Budget: 188 MUS$

Scope of the project: basic design of the terminal and preparation of the FEED documentation