Logo Proes
  • Home
  • About Proes
  • Activities
    • Water
    • Project development for industry
    • Design of maritime infrastructures
    • Construction
    • Energy
    • Industry
    • Land transportation infrastructures
    • Maritime and river infrastructures
    • Offshore wind farm engineering
    • Industrial installations
    • Environment
    • Beaches and coastal areas restoration
    • Structure rehabilitation and maintenance
    • Project supervision and works management
  • Projects
  • Contact
  • es_ES
  • Home
  • About Proes
  • Activities
    • Water
    • Project development for industry
    • Design of maritime infrastructures
    • Construction
    • Energy
    • Industry
    • Land transportation infrastructures
    • Maritime and river infrastructures
    • Offshore wind farm engineering
    • Industrial installations
    • Environment
    • Beaches and coastal areas restoration
    • Structure rehabilitation and maintenance
    • Project supervision and works management
  • Projects
  • Contact
  • es_ES

15

Puerto_Vigo

Technical assistance to the port security plan for the port of Vigo

2.000 buques anuales  228.000 TEU anuales Debido a las inmejorables condiciones naturales, el puerto de Vigo ofrece a los buques una bahía cerrada situada de

READ MORE »
Edificio_oficinas_Ministerio-Justicia_calle_Bolsa

Office building for the Ministry of Justice in Calle de la Bolsa, Madrid.

Edificio situado entre medianeras, de uso público-administrativo (oficinas). Consta de dos sótanos de aparcamiento, planta baja de atención al público y plantas 1ª, 2ª y

READ MORE »
Autovía_La_Sagra

La Sagra dual motorway bidding project. Section II: A-42 in Illescas - CM-4001 in Borox and Añover de Tajo, Toledo

98 M€ PEM  32,5 km longitud del tramo El tramo de autovía se compone de dos troncos con un origen común. El primero de ellos,

READ MORE »
Centro_Penitenciario_Soria

Technical assistance for the preparation of the strategic environmental assessment (SEA) of the new penitentiary centre in Soria

The new penitentiary centre is located in the province of Soria, in the area known as La Laguna. In 2009, the Directorate General for Quality and

READ MORE »
Plaza-de-castilla-ATTerrestres

Design and technical assistance for the construction of the Plaza de Castilla transport interchange, Madrid

102 M€ PEM  270.000  viajeros diarios El intercambiador subterráneo de plaza de Castilla acoge 25 líneas de la EMT y 55 interurbanas, y mueve en

READ MORE »
Puerto_de_El_Rosario_Fuerteventura

Protection Plan for the passenger pier in Puerto del Rosario, Fuerteventura

1,3 km línea de atraque 38.500 Teu anuales El muelle de cruceros del puerto del Rosario tiene como actividad el embarque y el desembarque de

READ MORE »
Portocolom

Hydrodynamic and sedimentary study for the improvement of the coves in the bay of Portocolom, Majorca.

A study of the agitation in the interior of the bay of Portocolom has been carried out based on the simulation of the conditions of

READ MORE »
Puerto_de_Alicante

Technical assistance for the Alicante port security plan

Recientemente el puerto de Alicante ha experimentado una ampliación hacia el sur, ganando terreno al mar con la construcción de cuatro muelles, formando así una

READ MORE »
VAC ESPASANTE OS RAMOS

Construction project of the VAC of the north coast. Section Espasante - Os Ramos

26,4 M€ PEM  5,96 km longitud de tramo El trazado de corredor es de nuevo diseño en su totalidad y se presenta durante casi todo

READ MORE »
pisuerga_3

Plataforma del corredor N-NE de Alta Velocidad, Valladolid – Burgos. Tramo: Nudo Norte Valladolid – Cabezón de Pisuerga

36,2 M€ PEM  1.366 m sobre el río El tramo Nudo Norte Valladolid-Cabezón de Pisuerga forma parte del corredor N-NE de Alta Velocidad que conecta

READ MORE »

Home

Calle Virgilio, 2, edificio 3
28223 Pozuelo de Alarcón, Madrid

913 454 565

  • Disclaimer
  • Privacy policy
  • Cookies Policy
  • Management policies
  • Complaints channel

© Proes 2026. Todos los derechos reservados