
42 lm overall
19 existing + 23 new
25.800 MDP
total investment
Mexico City's suburban network is being extended with a new line connecting the existing Lechería station to the new Felipe Alonso International Airport.
The "standard" station building is 213.50 metres long and 16.40 metres wide. Passenger access to the trains is via a shared central platform for both directions. This platform is 210 metres long and 8 metres wide.
Location Mexico City
Date: 2021-2022
Scope of the project: measurements for the constructive project