Caimito and La Correra Ptar Structures Project, Panama

250.000

benefited inhabitants

>20 m

clearance height of structures

The work carried out by Proes has consisted of the development of the structure corresponding to both the process and non-process buildings, as well as auxiliary structures required for the new wastewater treatment plants of Arraijan (Caimito) and La Chorrera in Panama.

More than thirty structures of all types have been defined, both above ground structures of the building or warehouse type with deep foundations, as well as structures of the circular tank type, or buried with a free height of more than 20 m under the shelter of reinforced concrete screens, all of them subjected to a design seismic acceleration of 0.32 g.

 

Location Panama

Date: 2021-2022

Scope of the project: structure project

Other projects

The aim is to improve safety at the crossing between platforms at 10 stations. Data collection and study of alternatives with

11.728.000 € PEM  1.500.000 m³ anuales Espartales es un barrio residencial de 230 hectáreas de extensión, perteneciente al Distrito IV de Alcalá de Henares, en

4.91 M€ EMP 3,858.74 m² total surface area This involves the extension of an existing fish market building and the provision of a new use for it.