
The objective is to improve safety at the crossing, between platforms at 10 stations.
It is carried out a data collection, study of alternatives with proposal of different solutions and typologies for the passage of passengers between platforms and to eliminate or disable the existing level crossing for the use of passengers.
Finally, if necessary, the corresponding Construction Project is drafted, whose execution may require the modification of tracks or associated railway installations (electrification, signalling and communications) and the displacement, extension, widening and/or modification of existing platforms, actions that must be planned and included in the construction project to be drafted.
Location País Vasco, Spain
Date: 2021-present
Scope of the project: Alternative study. Constructive Project