Seawater intake phase II of Mira's fish fattening unit in Coimbra, Portugal

Captación de agua de mar fase II de la unidad de engorde de pescado de Mira en Coimbra, Portugal

3.342.759 €

Budget 

Proes drafted the construction project for the seawater collection of the Mira fish farm in Portugal. It designed the connection piece for the intake line, consisting of a self-floating rectangular reinforced concrete box (16.8mx15.5mx8.15m) that connects three HDPE pipes (2×2000 mm+1×3000 mm) with a jacking pipe DN 3000 mm.

Among other activities, the hydraulic and structural calculations of the part are carried out, the naval stability is verified and the construction procedure is developed. During construction, Technical Consultancy is provided, developing, among other tasks, the monitoring system and the inspection and maintenance manual for the structure.

Location praia de Mira, Coimbra, Portugal

Date: 2012-2013

Presupuesto: 3.342.759 €

Scope of the project: constructive project and technical assistance

Other projects

The project is part of the future closure of the Toronto Bypass 407E with Highway 401. Proes carried out the construction design and tendering

29,000 inhabitants 215 km² river basin The characteristics of the wastewater to be treated are described, as well as the design parameters adopted, by making a

6 plants to be inspected The project consists of the inspection of the civil works of hydroelectric plants in La Coruña. These are the hydroelectric power station