Inspection of hydroelectric power plants in La Coruña

6 hydroelectric power stations

to be inspected 

The project consists of the inspection of the civil works of hydroelectric power plants in La Coruña. These are the Fervenza hydroelectric power station and dam, together with those at Ponte Oliveira, Castrelo, Santa Eugenia I and II, and Nuevo Pindo.

After visiting various plant locations, a report is drawn up containing a description of each specific civil works site and its condition. This report is accompanied by the corresponding photo gallery. Finally, the work is completed with the opinion of a specialised technical advisor from Altermia.

Location La Coruña

Date: 2009

Scope of the project: inspection of civil works related to various hydroelectric power plants

Other projects

The project is part of the future closure of the Toronto Bypass 407E with Highway 401. Proes carried out the construction design and tendering

29,000 inhabitants 215 km² river basin The characteristics of the wastewater to be treated are described, as well as the design parameters adopted, by making a

The main objective of the present study is the hydrological and hydraulic analysis for the determination of the 500-year flood level of the river bed of