Logo Proes
  • Home
  • About Proes
  • Activities
    • Water
    • Project development for industry
    • Design of maritime infrastructures
    • Construction
    • Energy
    • Industry
    • Land transportation infrastructures
    • Maritime and river infrastructures
    • Offshore wind farm engineering
    • Industrial installations
    • Environment
    • Beaches and coastal areas restoration
    • Structure rehabilitation and maintenance
    • Project supervision and works management
  • Projects
  • Contact
  • es_ES
  • Home
  • About Proes
  • Activities
    • Water
    • Project development for industry
    • Design of maritime infrastructures
    • Construction
    • Energy
    • Industry
    • Land transportation infrastructures
    • Maritime and river infrastructures
    • Offshore wind farm engineering
    • Industrial installations
    • Environment
    • Beaches and coastal areas restoration
    • Structure rehabilitation and maintenance
    • Project supervision and works management
  • Projects
  • Contact
  • es_ES

2

PERSPECTIVA-03 >san andres malaga

Upgrading of the dock and outer harbour of San Andrés, port of Málaga

11,39 M€ Budget  -16,5 m dredging in the basin n9. The project involves the development and improvement of the outer basin of the Port of Málaga.

READ MORE »
CadizTerminal-e1593686956359

New container terminal in the port of Cadiz Bay

73.023.880 € Budget 575 meters quay length. Due to the anticipated increase in container traffic expected for the bay port of...

READ MORE »
Escombreras

Proyecto de construcción de una terminal BB/TT en la dársena de Escombreras, Cartagena, Murcia

12,26 M€ PEM  25.000 – 315.000 TPM tamaño petroleros El proyecto consiste en la construcción de un nuevo pantalán, dotado con dos nuevos frentes de

READ MORE »
DEFENSAS BBG BILBAO

Construction project for the installation of two new fenders at BBG's LNG terminal in Bilbao.

El proyecto constructivo define las obras necesarias para la instalación de dos nuevas defensas dobles en el duque de alba de atraque sureste en la

READ MORE »
Informe de verificación estructural del muelle para uso de grúa móvil en Topolobampo, México

Structural verification report of the mobile crane pier in Topolobampo, Mexico

140 m quay length A technical report to verify the structural capacity of the existing container berths is to be drawn up.

READ MORE »
Reparación del muelle para grúa en la marina del puerto de Souk Al-Kout, Kuwait

Repair of the crane dock at Souk Al-Kout Port Marina, Kuwait

El muelle donde se sitúa la grúa para sacar los barcos del agua en el puerto de Al-Kout es una estructura con forma de U,

READ MORE »

Inspection and feed for the rehabilitation of the South Pier, and feasibility of the Mina Al-Ahmadi LNG terminal, Kuwait

600 MMcf/d capacidad máxima de carga El proyecto consiste en un estudio de alternativas de localización e implantación de una terminal de GNL en Kuwait,

READ MORE »
Muelle-juan-Gonzalo_Pto-Huelva

Construction project for the southern extension of the Juan Gonzalo Quay, Huelva

902 m longitud 12 m profundidad relativa El muelle Juan Gonzalo del puerto de Huelva está diseñado para mercancías generales y tráfico de graneles líquidos,

READ MORE »
MUGARDOS

Technical assistance for the drafting of the construction project of the LNG terminal in Mugardos, La Coruña.

176 M€ PEM  140.000 m³ capacidad máxima El proyecto de la planta de regasificación, y la red de gasoductos asociados, situado en la ría de

READ MORE »
Cajonero y armadura pilotes_Dársena Yates Cartagena

Construction project and technical assistance for a yacht berth in the port of Cartagena

7 M€ PEM   310  amarres Desarrollo del proyecto constructivo para la ampliación del puerto deportivo para megayates, consistente en dos muelles con estructura de pilotes

READ MORE »

Home

Calle Virgilio, 2, edificio 3
28223 Pozuelo de Alarcón, Madrid

913 454 565

  • Disclaimer
  • Privacy policy
  • Cookies Policy
  • Management policies
  • Complaints channel

© Proes 2026. Todos los derechos reservados