Structural verification report of the mobile crane pier in Topolobampo, Mexico

140 m

lenght of the pìer

It involves the preparation of a technical report to verify the structural capacity of the existing container berths at Bajo de Gallinas, Topolobampo terminal, with regard to the possibility of using a Gottwald HMK-300E mobile crane.

The terminal structure consists of four piloted modules measuring 21.60 m in plan, forming a 140 m long pier.

Location Topolobampo terminal, Mexico.

Date: 2006

Significant data: crane weight 416 t unladen and 460 t in operation

Other projects

145.730 € Budget 10,777 m length Proes participates in the execution and supervision of all the activities that were carried out in the installation.

45.8 M€ Budget 24 new hectares of surface area The extension of the port of Estepona involves work on 24 new hectares of surface area, of which

11.53 M€ Budget 17 m reinforced concrete caisson props On the occasion of the America's Cup, and the use of the inner harbour basin, the following works have been carried out