
The future expansion of Damietta LNG terminal will be developed right at the end of the canal, requiring a dredging operation. Additionally, across from the current it will be located a new methanol gas import terminal.
The objective of the project is to investigate, from a nautical perspective, the minimum conditions for operating both terminals, in accordance with international regulations.
Location port of Damietta, Egypt
Date: 2003-2004
Scope of the project: interference study for piers in the future expansion of the Damietta Liquefaction Terminal. Technical assistance for the bidding process. Real-time maneuvering simulation study to verify the suitability of the existing tug fleet in the port of Damietta and revision of operating procedures."