4,5 km
lenght piping
2.240.000 €
Budget
New T4 Monobuoy type oil loading and unloading terminal: 2 x 4.5 km long 18’ sealines between refinery and monobuoy; CALM buoy structure, including power, I&C, HPU for PLEM actuation valves; electrical submarine cable (4×50 mm2, 4.5 km) and F.O. cable for data transmission.
Rehabilitation of existing multi-buoys oil loading and unloading terminals T1, T2 and T3: refurbishment of buoys; power supply (photovoltaic panels), I&C and radio data transmission; PLET design.
Location Peru
Date: 2019-2023
Scope of the project: Development of the above-mentioned methodologies