Feasibility study for an LNG terminal in the Black Sea, Russia

The purpose of this work is to locate a site that has the optimum conditions to house a new LNG terminal for the operation of “QFlex” type vessels under the safety and operability conditions set forth in the applicable standards.

 

Location coast of Russia between the Ukrainian border on the Sea of Azov and the border with the Republic of Georgia on the Dead Sea.

Date: 2006

Scope of the project: feasibility study for the new terminal

Other projects

4.5 km length of pipelines 2.240.000 € PEM New T4 Terminal for loading and unloading of oil, monobuoy type: 2 pipelines (sealines) of 18’ and 4.5

21 km² surface area < 30.000 t ship capacity The port facility of Las Salinas de Torrevieja is located in the port of Torrevieja,

El puerto de Gijón, inmerso en un proyecto de ampliación de sus instalaciones portuarias tratando de reorganizar sus muelles, propone a Repsol el traslado completo