Feasibility study for an offshore LNG terminal in Morecambe Bay, UK

It is a feasibility study for a maritime LNG regasification terminal in Morecambe Bay.

The main objective has been to confirm the project's viability with both a configuration , based on FSRU (Floating Storage and Regasification Unit), as well as in a configuration onshore traditional (processing plant and conventional LNG carrier unloading jetty).

 

Location bahía de Morecambe, Reino Unido

Date: 2006

Scope of the project: feasibility study for the new terminal