Studies for new LNG vessel operation facilities in Guanabara, Brazil

10.000 m3/hour

LNG transfer capacity

14.000.000 m3/day

CNG emission capacity

The project aims to ensure the viability of a planned LNG terminal in Guanabara Bay, Brazil, and the adaptation of the port to it.

The work carried out by Proes includes: basic compatibility and design studies of the maritime terminal, propagation study, moored vessel study, technical specifications, manoeuvrability and risk study, compatibility software development, and technical assistance.

 

Location: Guanabara Bay, Brazil

Date: 2007- 2011

Scope of the project: Feasibility studies

Other projects

PROES Consultores, en UTE con Estudio7, ha llevado a cabo la Asistencia Técnica para el Control y Apoyo a la Dirección de las Obras del

4.5 km length of pipelines 2.240.000 € PEM New T4 Terminal for loading and unloading of oil, monobuoy type: 2 pipelines (sealines) of 18’ and 4.5

21 km² surface area < 30.000 t ship capacity The port facility of Las Salinas de Torrevieja is located in the port of Torrevieja,