Logo Proes

Feed and detailed engineering of a natural gas plant on Lake Kivu, Rwanda

400 m

of gas depth

Development of FEED for an extraction, treatment, and separation platform for natural gas trapped beneath the water column of Lake Kivu at a depth of 400 meters. Compression and transportation of natural gas to the shore through a submerged pipeline for the feed of combined cycle power plants.

The carried-out works include a 3D model of the complete offshore platform , stress analysis of critical pipeline systems, design of a suspended pipeline at a depth of -20 meters for 36 kilometers between the platform and the coast, and design and configuration of PAUs (Process Automation Units) and auxiliary equipment.

 

Location lake Kivu, Rwuanda

Date: 2020-2024

Scope of the project: FEED and detailed engineering

Other projects

145.730 € Budget 10,777 m length Proes participates in the execution and supervision of all the activities that were carried out in the installation.

45.8 M€ Budget 24 new hectares of surface area The extension of the port of Estepona involves work on 24 new hectares of surface area, of which

11.53 M€ Budget 17 m reinforced concrete caisson props On the occasion of the America's Cup, and the use of the inner harbour basin, the following works have been carried out