Feed and detailed engineering of a natural gas plant on Lake Kivu, Rwanda

400 m

of depth - gas location

Development of FEED for an extraction, treatment, and separation platform for natural gas trapped beneath the water column of Lake Kivu at a depth of 400 meters. Compression and transportation of natural gas to the shore through a submerged pipeline for the feed of combined cycle power plants.

The carried-out works include a 3D model of the complete offshore platform , stress analysis of critical pipeline systems, design of a suspended pipeline at a depth of -20 meters for 36 kilometers between the platform and the coast, and design and configuration of PAUs (Process Automation Units) and auxiliary equipment.

 

Location lake Kivu, Rwuanda

Date: 2020-2024

Scope of the project: FEED and detailed engineering

Other projects

Power supply: HV/MV substation: 69/13.2 kV 14 MVA 3 MV/LV substations: 13.2 kV/480 V (400 kVA, 1,000 kVA and 3×2500 kVA) Complete MV design and

8 m Luminaire pole height Roundabout lighting design based on luminaires on 8 m high poles, lamps of

9 Piperack aerial hydrocarbon pipes: 9 hydrocarbon pipes: 5 x 14″, 4 x 18’ and pipes for other installations: 2 x 2″ of