Basic engineering of loading facilities for LNG terminal and sulfur bulk carriers at Tombak, Iran

7.000 M€

of weight

266.000 m³

capacity of vessels (QMAX)

 

This is a basic project for the marine facilities for the construction of a natural gas liquefaction plant in the vicinity of the city of Tombak, in the Republic of Iran, in the Persian Gulf area.

The basic study focuses on the design of the offshore facilities, comprising 2+2 berths for the unloading of LNG carriers of 266,000 m³ (QMAX type) and one berth for sulphur-bearing solid bulk carriers of 12,000 dwt, including the necessary elements for ship-to-shore operations.

 

Location Tombak, Republic of Iran

Date: 2006-2007

Budget: 7.045.818,46 €

Scope of the project: basic engineering and studies

Other projects

Power supply: HV/MV substation: 69/13.2 kV 14 MVA 3 MV/LV substations: 13.2 kV/480 V (400 kVA, 1,000 kVA and 3×2500 kVA) Complete MV design and

145.730 € Budget 10,777 m length Proes participates in the execution and supervision of all the activities that were carried out in the installation.

45.8 M€ Budget 24 new hectares of surface area The extension of the port of Estepona involves work on 24 new hectares of surface area, of which