Detailed engineering for the new multipurpose terminal in Manta, Ecuador

  • Power supply:
  • HV/MV Substation: 69/13.2 kV 14 MVA
  • 3 MV/LV substations: 13.2 kV/480 V (400 kVA, 1,000 kVA and 3×2500 kVA)
  • Complete MV and LV design
  • Outdoor lighting (16 lighting columns, 40 m)
  • Connection of 980 reefers4 STS cranes
  • Remote alarm control system for refrigerators.
 

Location Ecuador

Date: 2014-2015

Scope of the project: electrical and lighting design

Other projects

8 m Luminaire pole height Roundabout lighting design based on luminaires on 8 m high poles, lamps of

9 Piperack aerial hydrocarbon pipes: 9 hydrocarbon pipes: 5 x 14″, 4 x 18’ and pipes for other installations: 2 x 2″ of

15.4 km Length Offshore LNG pipeline rack between land and FSRU structure 20’ LNG pipeline