Ingeniería de la terminal de almacenamiento y distribución de hidrocarburos, puerto de Barcelona

9

Hydrocarbon piping

Air Piperack. 9 hydrocarbon pipes: 5 x 14″, 4 x 18” and pipes for others installations: 2 x 2″ water supply, 2 ½” hydrocarbon water supply and 1 x 14″ fire protection.

Storage Tanks​.

Pumped seawater intake system and medium and low voltage power supply system. Instrumentation Automation and Control System and T (I&C).

Location South Pier, port of Barcelona

Date: 2005-2007

Scope of the project: detailed engineering

Other projects

Power supply: HV/MV substation: 69/13.2 kV 14 MVA 3 MV/LV substations: 13.2 kV/480 V (400 kVA, 1,000 kVA and 3×2500 kVA) Complete MV design and

8 m Luminaire pole height Roundabout lighting design based on luminaires on 8 m high poles, lamps of

15.4 km Length Offshore LNG pipeline rack between land and FSRU structure 20’ LNG pipeline