Structural model of the maritime terminal at the San Roque energy park, Cádiz

  • The purpose of surveying this terminal at the port of Algeciras is to assess the condition of the structure and its remaining structural capacity in order to carry out the planned extensions and modifications, and to study possible improvements.
  • The project was carried out in different phases: compilation of existing information from 1966 to 2019; topographic, bathymetric, and point cloud surveying; geometric modeling in a shared model in the Moeve cloud using Tekla software; physical inspection, with corresponding repair reports; and structural modeling and calculation.
 

Location: Cádiz, Spain

Date: 2024-2025

Scope of the project: structural design

Other projects

Planificación, dimensionamiento y diseño de detalle de las obras de ingeniería en agua y tierra y equipamiento para la puesta en servicio de una hidrovía

Development of the detailed design for the EPCC contract for the third terminal in Dahej, intended for the unloading of LNG vessels (from 125,000 to

669,532.00 US$ PEM 5 MTPA LNG Plant Capacity Over the past 16 years, the Government of Timor Leste has carried out engineering studies for the