1.311 m.
length of the submarine outfall
-24,25 m
diffuser depth
Wastewater is discharged into the sea through this underwater outfall, with a total length of 1,311.48 meters, consisting of two sections of pipes: a reinforced concrete pipe installed using microtunneling and a diffusion section made of HDPE.
the sinking section extens up to p. k. 1 + 197.50 meters, and the polyethylene section starts from the... p. k. 1+200,45 and exteds to the end of p. k. 1 + 311.48 meters. For the connection between the two sections, a special 3-meter piece is available. The start of the diffuser section is at a depth of -24.25 meters.
Location Dakar, Senegal
Date: 2021-2022
Alcance del proyecto: Offshore outfall project