Modernisation and extension of the Camberene wastewater treatment plant in Dakar, Senegal.

1.311 m.

length of the submarine outfall

-24,25 m

diffuser depth

Wastewater is discharged into the sea through this underwater outfall, with a total length of 1,311.48 meters, consisting of two sections of pipes: a reinforced concrete pipe installed using microtunneling and a diffusion section made of HDPE.

the sinking section extens up to p. k. 1 + 197.50 meters, and the polyethylene section starts from the... p. k. 1+200,45 and exteds to the end of p. k. 1 + 311.48 meters. For the connection between the two sections, a special 3-meter piece is available. The start of the diffuser section is at a depth of -24.25 meters.

 

Location Dakar, Senegal

Date: 2021-2022

Alcance del proyecto: Offshore outfall project

Other projects

The project is part of the future closure of the Toronto Bypass 407E with Highway 401. Proes carried out the construction design and tendering

29,000 inhabitants 215 km² river basin The characteristics of the wastewater to be treated are described, as well as the design parameters adopted, by making a