Plan especial del parque marítimo de la playa del Arenal, Burriana, Castellón

The main objective of the development proposed in the Special Plan is to improve the urban environment, proposing a solution that guarantees the public use and enjoyment of the coast.

 

Location Burriana, Castellón

Date: 2007

Scope of the project: development of the seafront of Burriana, between the port and the Seco river, with a park linked to the Arenal beach.

Other projects

The design and elaboration of the methodologies for carrying out the study has met the following objectives: To provide a basic methodological tool for the understanding of

Alteration of the waves induced by the configuration of new protective dykes Design of port spaces. Renovation

30.000.000 € EMP The following is carried out by proes: Integrated management of the coast Territorial division into Integrated Management Units