Evaluación probabilística de la energía de impacto de buques en las márgenes del río Támesis, Londres

The main objective of the project is the probabilistic assessment of the impact energy of ships on the temporary structures located on the banks of the River Thames in London, United Kingdom, for the construction of the central section of Thames Tideway Tunnel, tomando como base para el trabajo una metodología de carácter determinista.

The main tasks carried out by Proes have included the analysis and characterization of available information, consideration of potential failures resulting from ship impact on the structures under analysis, and the development of a probabilistic analysis methodology based on the probabilistic characterization of variables.

Location: London, UK

Date: 2017

Scope of the project: support and technical assistance for the construction of the new port.

Other projects

Planificación, dimensionamiento y diseño de detalle de las obras de ingeniería en agua y tierra y equipamiento para la puesta en servicio de una hidrovía

The purpose of surveying this terminal at the port of Algeciras is to assess the condition of the structure and its remaining structural capacity for

Development of the detailed design for the EPCC contract for the third terminal in Dahej, intended for the unloading of LNG vessels (from 125,000 to