250.000

benefited inhabitants

>20 m

clearance height of structures

The work carried out by Proes has consisted of the development of the structure corresponding to both the process and non-process buildings, as well as auxiliary structures required for the new wastewater treatment plants of Arraijan (Caimito) and La Chorrera in Panama.

More than thirty structures of all types have been defined, both above ground structures of the building or warehouse type with deep foundations, as well as structures of the circular tank type, or buried with a free height of more than 20 m under the shelter of reinforced concrete screens, all of them subjected to a design seismic acceleration of 0.32 g.

 

Location Panama

Date: 2021-2022

Scope of the project: structure project

Other projects

6 plants to be inspected The project consists of the inspection of the civil works of hydroelectric plants in La Coruña. These are the hydroelectric power station

The main objective of the present study is the hydrological and hydraulic analysis for the determination of the 500-year flood level of the river bed of