
250.000
benefited inhabitants
>20 m
clearance height of structures
The work carried out by Proes has consisted of the development of the structure corresponding to both the process and non-process buildings, as well as auxiliary structures required for the new wastewater treatment plants of Arraijan (Caimito) and La Chorrera in Panama.
More than thirty structures of all types have been defined, both above ground structures of the building or warehouse type with deep foundations, as well as structures of the circular tank type, or buried with a free height of more than 20 m under the shelter of reinforced concrete screens, all of them subjected to a design seismic acceleration of 0.32 g.
Location Panama
Date: 2021-2022
Scope of the project: structure project