Proyecto de ingeniería básica de la estructura del muelle auxiliar de Radomiro Tomic, Chile

296 m

Pier 

The project involves the development of basic engineering for the structure of the auxiliary dock for the Caleta Viuda seawater desalination plant. This includes a 296-meter-long jetty, consisting of gantries with a 6-meter span, spaced at 8 meters apart except for the last four, which have an 8-meter span.

Additionally, a dilution study is conducted, which involves designing the system to be installed in the brine discharge outfall from the desalination plant to minimize the environmental impact in the discharge area.

 

Location Commune of Tocopilla, Antofagasta, Chile

Date: 2014

Scope of the project: Basic Engineering for the Dock Structure and Dilution Study

Other projects

4.5 km length of pipelines 2.240.000 € PEM New T4 Terminal for loading and unloading of oil, monobuoy type: 2 pipelines (sealines) of 18’ and 4.5

21 km² surface area < 30.000 t ship capacity The port facility of Las Salinas de Torrevieja is located in the port of Torrevieja,

El puerto de Gijón, inmerso en un proyecto de ampliación de sus instalaciones portuarias tratando de reorganizar sus muelles, propone a Repsol el traslado completo