
188 M$
of budget
500 million m³
of diary supply
The basic project consists of drafting the FEED documentation for the LNG terminal at Qasim Port, Karachi, including the review of the berth configuration and design of the platform structures, the terminal's mooring dukes, as well as the pipeline and pipeline.
Location port of Karachi, Sind Region, Pakistan
Date: 2012
Budget: 188 MUS$
Scope of the project: basic design of the terminal and preparation of the FEED documentation