The project is part of the future closure of the Toronto Bypass 407E with Highway 401. Proes carried out the construction design and tendering of the 10 km long West Durham Link.

Road drainage was designed using a combination of storm sewers, cross culverts, underdrains and roadside ditches. The drainage system was designed in accordance with standards and reference documents between HM The Queen by Right of Canada, and the 407 East Development Group General Partnership, and was designed to have a minimum capacity to carry the 10-year design storm without entering traffic lanes.

Location Toronto, Canada

Date: 2005-2009

Scope of the project: Drainage system 

Other projects

29,000 inhabitants 215 km² river basin The characteristics of the wastewater to be treated are described, as well as the design parameters adopted, by making a

6 plants to be inspected The project consists of the inspection of the civil works of hydroelectric plants in La Coruña. These are the hydroelectric power station

The main objective of the present study is the hydrological and hydraulic analysis for the determination of the 500-year flood level of the river bed of