Technical and environmental supervision of the bridge programme Ruta 43 Viacha-Thola-Kollo-Hito IV, Bolivia

13.200.000 US$

Budget 

The project is part of a program for the construction of 39 bridges by the Bolivian Road Administration (ABC), with a total investment of 13,200,000 $.

The construction of these bridges is divided into 7 packages: the first and second packages consist of the Viacha-Charaña section with the construction of 17 bridges; the third and fourth packages cover the Unduavi-Sacambaya section with the construction of 14 bridges; the fifth and sixth packages are located in the Caranavi-Guanay-Mapiri section with five bridges; and finally, the seventh package, which is the one in question, is located between Viacha and Hito IV with three bridges.

Location Ruta 43, Viacha, Thola Kollo, Bolivia

Date: 2011-2012

Budget: 475.669 Bolivianos

Scope of the project: Technical and environmental supervision

Other projects

19 m access channel length 4.5 million m³ dredging volume The work consists of technical assistance, supervision and monitoring of

211.365 € PEM 176 obras de paso inspeccionadas El objeto de este proyecto es la realización de una serie de inspecciones principales de puentes ferroviarios

2.700.000 Toneladas anuales de GNL Se trata de un estudio de alternativas para la localización y elección de una tipología de estructura de amarre para