Supervision and technical assistance for the construction of the flexible LNG terminal in Medan, Indonesia

85.000.000 USD$

of budget

Proes is providing project management services in collaboration with Foster Wheeler for the development of the new offshore FRSU (Floating Storage and Regasification Unit) terminal, as well as the associated gas pipeline between the facility and the coastline.

The project consists of the development and supply of a regasification vessel (FSRU), a subsea pipeline to transport natural gas from the FRSU to land, an onshore pipeline with associated process facilities and a gas facility control.

 

Location Medan, Sumatra, Indonesia

Date: 2010-2012

Scope of the project: maritime engineering consulting services

Other projects

19 m access channel length 4.5 million m³ dredging volume The work consists of technical assistance, supervision and monitoring of

211.365 € PEM 176 obras de paso inspeccionadas El objeto de este proyecto es la realización de una serie de inspecciones principales de puentes ferroviarios

2.700.000 Toneladas anuales de GNL Se trata de un estudio de alternativas para la localización y elección de una tipología de estructura de amarre para