Phosphate terminal at the port of Aqaba, Jordan

150 M$

of budget

180.000 t

of storage

The detailed project addresses the design of the onshore storage plant and the marine terminal required for the export of phosphate.

The onshore works covered the design of the main storage hall for more than 180,000 t, the cargo transfer building, the foundations for the conveyor belts, as well as general service buildings, paving, installations, etcetera. The maritime part is made up of a 190 m piloted mooring front, consisting of two structures parallel to the coastline, supporting two loading bays with a capacity of 2,500 t/h each, two berthing docks, an access bridge and two connecting bridges between the structures.

 

Location southern port of Aqaba. Red Sea

Date: 2010-2011

Scope of the project: basic terminal design and drafting of FEED documentation

Other projects

145.730 € Budget 10,777 m length Proes participates in the execution and supervision of all the activities that were carried out in the installation.

45.8 M€ Budget 24 new hectares of surface area The extension of the port of Estepona involves work on 24 new hectares of surface area, of which

11.53 M€ Budget 17 m reinforced concrete caisson props On the occasion of the America's Cup, and the use of the inner harbour basin, the following works have been carried out