Feasibility study for an LNG terminal at Marsa El Brega, Libya

3,2 million metric tons

per year

300

annual vessels

Marsa el Brega is a significant industrial port located on the Gulf of Sirte, at the southernmost point of the Mediterranean.

The activities of supply vessels began in 1961. Later, a refinery and a natural gas liquefaction plant were built, and in 1977, an ammonia conversion plant was inaugurated. The port is becoming the main petrochemical hub of Libya.

 

Location: Marsa el Brega, Gulf of Sirte, Lybia

Date: 2004

Scope of the project: technical assistance for the assessment of a new LNG terminal

Other projects

PROES Consultores, en UTE con Estudio7, ha llevado a cabo la Asistencia Técnica para el Control y Apoyo a la Dirección de las Obras del

4.5 km length of pipelines 2.240.000 € PEM New T4 Terminal for loading and unloading of oil, monobuoy type: 2 pipelines (sealines) of 18’ and 4.5

21 km² surface area < 30.000 t ship capacity The port facility of Las Salinas de Torrevieja is located in the port of Torrevieja,