- Project for the adaptation of the existing WWTP and its expansion to accommodate the increased capacity required.
- Low Voltage (LV) Power Supply from the existing substation at the station and complete electrical design: motor control panels, power circuits, I&C (Instrumentation and Control), external lighting, and grounding system.
- Automation and Instrumentation & Control (I&C) Design.
Location Húmera, Madrid
Date: 2022
Scope of the project: adaptation and extension project, automation and instrumentation, and control