Studies on the adaptation of the port of Pecem in Brazil for LNG vessel operation

7.000.000 

m3/day of capacity

The project aims to ensure the viability of a planned LNG terminal in Puerto Pecem, Brazil, and the adaptation of the port to it.

First of all, the limit operating conditions (wind, tides, etc.) are assessed, followed by the recommended manoeuvres and the need for tugboats. Finally, emergency situations are analysed, and the bases for operating procedures are established.

Location Puerto Pecem, State of Ceará, Brazil

Date: 2011

Scope of the project: Execution Project and Works Management

Other projects

4.5 km length of pipelines 2.240.000 € PEM New T4 Terminal for loading and unloading of oil, monobuoy type: 2 pipelines (sealines) of 18’ and 4.5

19 m access channel length 4.5 million m³ dredging volume The work consists of technical assistance, supervision and monitoring of

21 km² surface area < 30.000 t ship capacity The port facility of Las Salinas de Torrevieja is located in the port of Torrevieja,