Supervision of the Salvador de Bahia metro, Brazil

7.300 m

Lenght 

5

Stations

The scope of the work to be carried out by Proes is divided into three phases. Firstly, a verification of the initial hypotheses and conclusions reached in the technical feasibility report is carried out. Subsequently, during the execution of the works, the development of the works and the contracts is monitored. Finally, a report is drawn up in which it is verified that the reception of the different elements that make up the project is carried out in accordance with the specifications of the contracts.

Location Salvador de Bahía, Brazil

Date: 2011

Scope of the project: feasibility reports

Other projects

19 m access channel length 4.5 million m³ dredging volume The work consists of technical assistance, supervision and monitoring of

211.365 € PEM 176 obras de paso inspeccionadas El objeto de este proyecto es la realización de una serie de inspecciones principales de puentes ferroviarios

2.700.000 Toneladas anuales de GNL Se trata de un estudio de alternativas para la localización y elección de una tipología de estructura de amarre para