10.000 m3/hour
LNG transfer capacity
14.000.000 m3/day
CNG emission capacity
The project aims to ensure the viability of a planned LNG terminal in Guanabara Bay, Brazil, and the adaptation of the port to it.
The work carried out by Proes includes: basic compatibility and design studies of the maritime terminal, propagation study, moored vessel study, technical specifications, manoeuvrability and risk study, compatibility software development, and technical assistance.
Location: Guanabara Bay, Brazil
Date: 2007- 2011
Scope of the project: Feasibility studies