Water intake and discharge intakes for the Agadir desalination plant, Morocco

275.000 m3/day

producción de agua

400.000 m3/day

posibilidad de ampliación

This project includes the necessary works for seawater intake and brine discharge for the Agadir desalination plant in Morocco.

The construction of the desalination plant is planned in two stages. In the first phase, the necessary infrastructure will be provided to meet the production needs. In the second phase, the facilities will be expanded to supply double the flow. However, all the intake infrastructure is constructed for both phases.

Location Agadir, Morocco

Date: 2011

Scope of the project: diseño de las conducciones de captación y vertido de la desaladora, diseño de la torre de captación y cámara de bombas, estudio de dilución y de clima marítimo

Other projects

The project is part of the future closure of the Toronto Bypass 407E with Highway 401. Proes carried out the construction design and tendering

29,000 inhabitants 215 km² river basin The characteristics of the wastewater to be treated are described, as well as the design parameters adopted, by making a

6 plants to be inspected The project consists of the inspection of the civil works of hydroelectric plants in La Coruña. These are the hydroelectric power station