Detailed engineering for Gazprom's new LNG terminal in Portovaya, Russia

1.500.000 t

Liquefied LNG 

Gazprom is promoting the project for the construction of a new LNG terminal in Portovaya, in the Baltic Sea.

The scope of the works to be carried out by Proes includes detailed engineering for the design of four caissons in 2017 and two more in 2018, as well as the necessary stability calculations, structural calculations, and technical specifications.

 

Location Portovaya, Leningradskaya Oblast, Russia

Date: 2017

Scope of the project: detail engineering, reinforced concrete caisson design, stability calculations, structural calculations, and technical specifications.

Significant data: the plant will liquefy 1.5 million tons of LNG from the nearby compression station at Portovaya, which is part of Gazprom's Nord Stream pipeline.

Other projects

4.5 km length of pipelines 2.240.000 € PEM New T4 Terminal for loading and unloading of oil, monobuoy type: 2 pipelines (sealines) of 18’ and 4.5

21 km² surface area < 30.000 t ship capacity The port facility of Las Salinas de Torrevieja is located in the port of Torrevieja,

El puerto de Gijón, inmerso en un proyecto de ampliación de sus instalaciones portuarias tratando de reorganizar sus muelles, propone a Repsol el traslado completo