Basic project for the extension of the breakwater at El Tarajal in Ceuta

42 m

lenght of the structure 

The project consists of the design of a structure to extend the Tarajal breakwater, which acts as a physical border between Ceuta and Morocco. It is a 42 m long permeable structure made up of a metal grid-shaped structure coated with high-density polyethylene.

The base of the structure is made up of concrete piles arranged every 6 m longitudinally, anchored to the ground by means of footings and micropiles. a concrete lintel is supported on these piles, which serves as a base for the support of a lattice structure based on metal profiles that make up the upper pedestrian area.

Location: Autonomous City of Melilla

Date: 2014

Scope of the project: basic project

Other projects

PROES Consultores, en UTE con Estudio7, ha llevado a cabo la Asistencia Técnica para el Control y Apoyo a la Dirección de las Obras del

4.5 km length of pipelines 2.240.000 € PEM New T4 Terminal for loading and unloading of oil, monobuoy type: 2 pipelines (sealines) of 18’ and 4.5

21 km² surface area < 30.000 t ship capacity The port facility of Las Salinas de Torrevieja is located in the port of Torrevieja,