Hydrological and hydraulic study in Villanueva de Perales, Madrid.

The main objective of this study is the hydrological and hydraulic analysis for the determination of the 500-year flood level of the Chorrera de Peral Merino riverbed as it passes through the property located at Calle Julio Álvarez, s/n, UE 5, in Villanueva de Perales (Madrid), in order to develop the urban planning currently in force in this locality.

With this objective in mind, flood flows and flood plains have been studied for return periods of 5, 100 and 500 years, both in current and future situations. Based on hydraulic modeling, these flows are converted into flood zone limits and floodplains for the two phases of the study.

Location Julio Álvarez Street, U.E. 5, Villanueva de Perales, Madrid

Date: 2007-2008

Scope of the project: hydrological, hydraulic and maximum rainfall study. Proposal of channeling alternatives.

Other projects

The project is part of the future closure of the Toronto Bypass 407E with Highway 401. Proes carried out the construction design and tendering

29,000 inhabitants 215 km² river basin The characteristics of the wastewater to be treated are described, as well as the design parameters adopted, by making a

6 plants to be inspected The project consists of the inspection of the civil works of hydroelectric plants in La Coruña. These are the hydroelectric power station