- Development of the detailed design for the EPCC contract for the third terminal in Dahej, intended for the unloading of LNG vessels (from 125,000 to 266,000 m³), ethane (from 80,000 to 150,000 m³) and propane (from 65,000 to 98,000 m³).
- The terminal consists of a 2,480 m long access bridge and a double-level rectangular unloading platform measuring 48.8 x 53.3 m, supported by piles 1,400 mm in diameter and up to 75 m long. The berthing system includes four mooring dolphins, each supported by 22 metal piles with a diameter of 1,168 mm.
Location: Dahej LNG terminal, India
Date: 2025
Scope of the project: EPCC contract for the third terminal