Pre-investment technical design study Ichilo-Mamoré waterway project. Section I

  • Planning, sizing, and detailed design of water and land engineering works and equipment for the commissioning of a waterway on the Ichilo-Mamoré axis with a total length of approximately 1,200 km of navigable waterway, seven commercial and passenger ports, and two tourist complexes.
  • The following works are included: field studies of the current navigability conditions of the river, bathymetry, port inventory, socioeconomic study, market study, traffic and transport study, operational sustainability study, geological-geotechnical study, hydrological-hydraulic study, detailed design of ports, detailed design of navigable waterways and tourist complexes, environmental impact assessment, maintenance plan, and investment plan.
 

Location: Ichilo-Mamoré, Bolivia

Date: 2023-2025

Scope of the project: design planning for engineering works, preliminary studies

Other projects

The purpose of surveying this terminal at the port of Algeciras is to assess the condition of the structure and its remaining structural capacity for

Development of the detailed design for the EPCC contract for the third terminal in Dahej, intended for the unloading of LNG vessels (from 125,000 to

669,532.00 US$ PEM 5 MTPA LNG Plant Capacity Over the past 16 years, the Government of Timor Leste has carried out engineering studies for the