Logo Proes

Conditioning of Cala Canutells cove in Mahón, Balearic Islands

164,45 M€

Budget 

1.200 m³

of sand

The actions included in this basic project for the improvement of drainage on the beach of Cala Canutells consist of improving the existing channel by building a rigid and permeable U-shaped structure of about 75 m in total length.

Drainage of the beach by means of perforated pipes and geotextile. Two buried pipelines are laid following the upwelling points located on the beach. Pouring of the sand filter layer, which consists of the pouring of about 1200 m of sand.3 of quarried sands, which will be covered with previously screened native sand.

 

Location Cala Canutells, Mahón, Menorca, Balearic islands

Date: 2011

Scope of the project: basic project

Other projects

Buenaventura is a strategic enclave for international shipping lines, as it is close to the Panama Canal, and is the port of the Pacific.

3,000 km of coastline The project consists of the characterisation of the coastal environment and its geomorphology for the evaluation of potential erosion areas.

The main objective of the development proposed in the Special Plan is to improve the urban environment, proposing a solution that guarantees public use and enjoyment.